Through the funds secured for infrastructure upgrades and road upkeep, the Local Authority has been able to put into action road maintenance projects, such as pothole patching, road shoulder protection, and stormwater drain construction. Pothole patching has been done in the Central Business District (CBD) while road shoulder protection and stormwater drain construction are in progress along Barring Road.
Pothole patching in the CBD
Road shoulder protection along Barring Road.
200m storm water drain trench along Barring road.
Repaired manhole Central Road & Kingsway Rd T junction.